Home construction: The hectic as it can be~

Filed Under (Life, Products) by admin on 22-04-2008

We’ve been on the rent house for over a year now till my father finally found a good peace of land in a good area in Abbottabad and started the construction on it. Though i never liked Abbottabad as a place to live permanently because its nearly a dead city as they call it, mostly with old age people living there just because of the great weather and peaceful nature the town has. The place however is not that bad but i hate it because the town shuts off sharp before 11PM which is just the beginning of my full swing time;).

Anyways the house that my dad started probably over 4-5 months back is 60% complete as far as i think so since most of the work from foundations , ceilings, 3 storey building architecture, the plasters are all done, even the pipe fitting for gas , water and the sewerage system i believe is installed. The left over work is of the finishing , paints. installing the delta faucets , my father plans to put the best among delta kitchen faucets and the delta bath faucet in the kitchens and bathrooms respectively, the windows are to be done soon and the marble floor is sooner or later going to be selected. The best part and my favorite at least is the outer look and its planned to be rock walled unlike the dry stone though , its a kind of new technology as per the use is concerned and looks really amazing with one not having to worry about painting the house over and over again. The main gate for the house am not sure about it yet but i want a decent one to be put in there and i’ll have to talk to my dad about it specially;).

I am more than worried about my room , it has a huge window at the front and a big rack for cupboard, etc for clothes and stuff but it has a shared bathroom and that too very small in size.Though i plan to get it designed myself but since am back at the dorms here and the construction is in the full swing i really can’t help much though i really want to:)

Leave a Reply